Power | 100W | Battery | Lithium Battery |
CRI | >80 | CCT | 6500K |
IP | 65 | Beam Angle | 120 degrees |
PF | >0.9 | LPW | 120LM/W |
Warranty | 3 years | Raining day | 2 days |
Solar Panel | Polysilicon solar panels | Production | 5-10 days |
Light power: 100w,
LED chip: 2835 chip 300 pcs,
Solar Panel: 6v/15w polsilicon,
Battery: 3.2v/12ah lithium battery,
Charging time: 6 hours, Working time: -20 degrees to 65 degrees,
Light size: 47x19cm, Material: ABS+PC, with light sensor, motion sensor, remote controller and white short arm,
Package: 54x16x22cm/pc, 3kg
Overview
Basic SpecificationWarranty and DeliveryFeature
Polycrystalline solar panel: Good light absorption and fast charging. Sustainable lighting after full power 3 rainy days
High-Light 2835 LED chip or COB LED: High brightness and durability, low light decay, good color rendering
On/Off Switch: Easy to use and easy to operate
Thickened lamp body caliber: Thick aluminum, durable and corrosion resistant
Sensor: Light control + Human body induction Selling Unites: Single Item MOQ: 10 pieces for each model Customization: Customized Logo -100pieces / Customized Package- 10000 pcs Production time: 5-7 days for samples / 10-15 days for standard orders Warranty: 2-3 yearsApplication Widely used in shopping mall, exhibition hall, parking lot, playground, gymnasium, billboards, parks, yard, sports field, square, construction site,sculpture, national green lighting project, building facade and public corridor, stair corridor and other indoor and outdoor lighting 1. Replace conventional Stadium Lights; 2. Precision Die Cast Aluminum Housing RoHS; 3. Fade Resistant Powder Coat Finish ; 4. Easy Installation ; 5. CE ROHS listed.BenifitAbout UsPackageShipmentFAQAina-4 Technologies (Shanghai) Co., Ltd. is a private limited company registered in Shanghai, China. It specializes in the R&D, design, manufacture, and marketing of light emitting sources and lighting fixtures. It is an enterprise formed by four (4) pioneer lighting companies, putting their resources together to produce products and services that create sustainability not only for the environment, but also for the economies and societies that the company grows with.


The prepare time for item is around 10-15 days. All the items will be test before shipment.
All the goods are sent from China for now.
All the order will be shipped by DHL, TNT, FedEx, or By sea, by air etc. Estimated Time of arrival is 5-10 days by express, 7-10 days by air or 10-60 days by sea.

